
Eskom applied stage-6 load shedding early on Sunday after a number of producing models at Camden energy station tripped.
On Saturday, Eskom utilized stage-3 energy cuts, successfully chopping 3GW to the nationwide grid. It did so with none prior warning at 5.30pm.
Common breakdowns at Eskom’s fleet of ageing coal-fired crops, offering the majority of electrical energy to the economic system, are sometimes the reason for load shedding — an incremental system the place stage 1 sees 1GW minimize from the system, with stage 6 the very best formally applied so far. — Wendell Roelf, (c) 2025 Reuters
Get breaking information from TechCentral on WhatsApp. Enroll right here.
Don’t miss:
Eskom’s subsequent disaster, and why resolving will probably be require ‘powerful trade-offs’